Equipment & Material Supply: Supply of equipment and materials required for the system.
Engineering & System Configuration: Preparation of detailed engineering drawings and complete system configuration.
Electrical Panel Installation: Installation and integration of electrical control panels.
System Programming: Development and implementation of control programs for the system.
FAT – Factory Acceptance Test: System inspection and testing prior to shipment.
SAT – Site Acceptance Test: Comprehensive system testing at the site before commissioning.
Testing, Commissioning & Handover: System inspection, commissioning, and handover to the client.
Training & Technology Transfer: Training on system operation, maintenance, and servicing, together with technology transfer to the client’s technical team.